PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing main sprinkler raiser at the 2nd floor Facing East.jpg Installing metal framing at the 4th floor Facing North.jpg Laying out block at the 1st floor Detention cells Facing North.jpg Main Sprinkler raiser at the 2nd floor Facing West.jpg Started the interior framing at the 2nd floor facing South.jpg Storm piping at the 4th floor Facing West.jpg Installed Duct work hangers at the 4th floor Facing North.jpg Welding metal clips along the low roof facing North.jpg Welding metal clips along the low roof Facing West.jpg
Previous pageNext page Started the interior framing at the 2nd floor facing South
Started the interior framing at the 2nd floor facing South